Setred works with various subcontractors for design and production, as well as for final packaging and assembly of different subsystems. The engineering team has to make sure the designs are made according to the original specifications, and that they fit together. Although subcontractors are to use STEP AP 214 whenever possible, they have to use different CAD programs from different vendors. This leads to regular troubles with interchange at Setred.
Continue reading in dedicated Success Story.